← Temecula Custom Crush

Red wine program · 2027 harvest

Red wine custom crush capacity in Temecula.

Build a red wine production path from grape receipt through fermentation, pressing, ML monitoring, barrel or tank aging, lab work, storage, and bottling coordination.

Best first details

  • • Cabernet, Syrah, Grenache, Zinfandel, Merlot, blends, or other red lots need a 2027 production home
  • • You can share an estimated tonnage or case target now, even if harvest numbers may move
  • • You need barrel or tank aging included in the production plan
  • • You want one conversation covering crush, cellar work, storage, and bottling coordination

Production path

Give the cellar team enough context to reserve the right tanks, labor, and storage.

Harvest intake

Fruit source, tons, varietals, pick window, target style, barrel assumptions, and commercial deadline.

Crush and fermentation

Grape receipt, crush and destem, yeast and nutrient additions, fermentation monitoring, cap management planning, and cellar work.

Pressing and ML

Press timing, malolactic bacteria and monitoring, rackings, SO2 plan, and early aging decisions.

Aging and storage

Barrel or tank aging management, quarterly SO2 and topping, lab checks, stability planning, and storage through bottle-ready wine.

FAQ

Red wine custom crush questions.

What should I send before asking about red wine custom crush capacity?+

Send fruit source, estimated tons, varietals, pick window, target style, barrel or tank assumptions, storage needs, bottling target, and who can approve harvest decisions.

Can you screen red wine projects if exact harvest tonnage is still changing?+

Yes. A realistic low-to-high range is enough to begin a fit conversation, especially before August when tank, labor, and storage planning gets tighter.

Is barrel aging part of the red wine program?+

The red wine production path can include barrel or tank aging management, quarterly SO2 and topping, lab analysis, rackings, stability planning, storage, and bottling coordination.

Request capacity

Send the red wine details that decide fit.

Include varietals, estimated tons, pick window, barrel or tank assumptions, storage needs, and bottling target. Choose the before-August option if timing is urgent.

Next crush: August 2027

Check Harvest Availability

Our next crush begins in August 2027. Tell us your volume, fruit status, production window, and services needed. Add the optional planning details if you know them; you do not need a finalized production plan to ask about fit. If fruit is moving within 7 days, submit your details and call (951) 410-8388.

1. Volume / tons
2. Fruit status
3. Pick window
4. Services needed
What happens next: we review your requested timing, tanks, labor, storage, and cellar scope. Submitting a request does not reserve capacity or confirm a receiving appointment. Wait for direct confirmation before scheduling delivery.
Production quote request details
Required details0 of 7 complete

7 required details remain. Everything else is optional. Your progress is saved in this browser tab until you submit or close it.

Use a complete address, such as name@example.com, so we can reply to your quote request.

Optional. Add a complete number if you want a call; email is enough to request a review.

Choose a suggested range or type your own tons, gallons, or case target. If undecided, choose “Need help estimating.”

Optional. Add a bottling deadline, launch month, or exact pick date if one is already set.

This separates ready-to-schedule fruit from sourcing, private-label, or feasibility requests.

This helps us prioritize urgent harvest capacity requests and route exploratory projects correctly.

Working with bulk wine or a private label? Choose the no-grape-pick option. Still exploring? Choose timing undecided.

Services Needed *

Choose at least one. Relevant services may be preselected from the page you visited; review or change them before sending. If you are unsure, choose Not sure / need guidance.

Optional. This helps us understand which custom-crush resources and referrals bring qualified projects to us.

No spam. We use this to screen project fit, 2027 capacity, services needed, and the fastest next step.

Call NowRequest Quote
Next crush: August 2027 · Plan ahead